Unique Skill ID: KS127MX6S0K86B13J69C

PDCA Cycle

PDCA is an iterative four-step management method used in business for the control and continuous improvement of processes and products. It is also known as the Deming circle/cycle/wheel, the Shewhart cycle, the control circle/cycle, or plan–do–study–act (PDSA). Another version of this PDCA cycle is OPDCA. The added "O" stands for observation or as some versions say: "Observe the current condition." This emphasis on observation and current condition has currency with the literature on lean manufacturing and the Toyota Production System. The PDCA cycle, with Ishikawa’s changes, can be traced back to S. Mizuno of the Tokyo Institute of Technology in 1959.

Read Full Description
This Skill is part of Lightcast Open Skills, a library of over 32,000 skills used by schools, communities, and businesses that has become the standard language.
Search for other skills
Continuous Improvement Process
Define Measure Analyze Improve And Control (DMAIC)
Gemba
Kaizen Methodology
Lean Certification
Lean Manufacturing
Lean Six Sigma
Six Sigma Green Belt
Six Sigma Methodology
Toyota Production System

PDCA Cycle Job Postings Data

Top Companies Posting

Job Postings Analytics Loading Spinner

Top Job Titles

Job Postings Analytics Loading Spinner

Job Postings Trend

Job Postings Analytics Loading Spinner

Live Job Postings

Job Postings Analytics Loading Spinner

Looking for more data on job postings?